Why do we have an Ignite Master Campus Plan (MCP)?  

We want to Ignite a movement to reach 1,000 people with the gospel and release 200 equipped next-generation leaders into the Church in the next five years. The Ignite Master Campus Plan (MCP) enables us to provide the facilities necessary for evangelism and training the next generation leaders. 

Ignite Letter May 2024 

What is the MCP? 

The Ignite Master Campus Plan (MCP) is a four-phase plan to provide additional and renovated spaces for our student ministry, senior adults, Life Groups, and offices. 

 

When are these changes happening?  

  • Our church voted to implement the Ignite MCP on March 26, 2023.  
  • Our Ignite Master Campus Plan Offering was received on September 10, 2023.  
  • We plan to complete Phase 1 by the end of May 2024.

How do I get involved? 

Prayer

We are asking our church family to pray diligently and are confident the Lord will speak clearly to all of us.

Obey

Obey the Lord’s leadership to give a sacrificial gift toward our Ignite MCP or on a recurring basis.  (The MCP offering was for the Main Campus and Chapel projects. The south campus gym for Whitesburg Christian Academy is being funded by the Academy family.)

Master Campus Plan Renovation

Master Campus Plan

Renovation Renderings by Chapman Sisson

Main Campus header

Primary Goals:

  • Improve campus flow and facility layout for future generations, while completing renovations of the oldest parts of the campus
  • Improve access/egress and Life Group location for Senior Adults
  • Create ministry appropriate space for a growing Student Ministry
  • Maximize parking
  • Improve and create adequate office space for the ministry team

South Campus header


The South Campus Chapel renovation has been completed. The renovations on the Chapel,
include new paint, lighting, audio/video, and stage flooring. These upgrades will make this space even more beautiful and functional for worship, weddings, and funerals. Thank you for your generosity and support of this wonderful project!

Note: The gym project on our South Campus is a part of our Master Campus Plan. However, the project is being funded by donations from Academy families and funds through the Academy budget. The gym is slightly ahead of schedule due to good weather and the work of an excellent contractor and crew. They have a tentative completion date of mid-February, 2025.


Click the button below to learn more about Ignite.

Ignite Page

Updates

Phase 2 Is Underway
Phase 2 work has begun! This will involve demolition of the existing drive-through canopy at the North Lobby entrance, construction of new Student building and Senior Adult Life Group space, and construction of adjacent secondary Senior Adult parking lot. Anticipated completion is September 2025.

For helpful construction information, read below or click the right-side image to watch a video.



• The North Lobby (Entrance 9) is closed until further notice.

• A sidewalk from the parking lot to a small entrance at the north side of the Worship Center will be available.

• Senior adults are encouraged to use the Atrium and South Lobby entrances (Entrances 3 and 5).

• Wheelchair and handicap accessible drop off will be at the South Lobby (Entrance 5) on Sanders Road.

• Please utilize the shuttles and golf carts to assist you from the parking lots.

 Please feel free to dress comfortably for church services and wear sturdy footwear to navigate the parking lots during the renovation process.

Thank you for your continued prayers and financial support for our Ignite MCP!